GLAND,CABLE,TYPE QR671,PTFE

Material 4200001459 · GLAND · Plant 1000

BReorderNormalSlow-moving
Material
4200001459
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 7 FuncLocs A/B)
Supplier
PRIMA LOGAM SENTOSA PT
Lead time
40 d · P80 52 d
Unit price
Rp 561,410

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~40 days; expected demand during lead time 0.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 561,410 · order by 01 Oct 2026
Expected arrival ≈ 40 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 561,410
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 280 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 52.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~16 days.

Installed on 7 functional locations

2 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-436A-CSS
CONTROL SWITCH STATION FOR PP-436A-M
B110.19
PX_PP-1612-M
MOTOR FOR PP-1612
B100.19
PX_FIT-1526D
BFW FLOW
C100.04
PX_LIT-1793-45A
HE-1277C LEVEL
C100.03
PX_LIT-1984
VD-884A LEVEL
C100.03
PX_PIT-817
FUEL OIL PRESSURE
C300.04
PX_TEL-898A
TEMPERATURE
S110.01

Lead time and procurement

Lead time 40 ± 16 days (PO history + category, 2 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
30 Jul 2025PR03
Regular replenishment
1Rp 548,49728 Aug 202529 d
18 May 2025PR01
Import / long-lead
2Rp 574,32209 Aug 202583 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Jun 2025MediumPX_TEL-898AInstall scaffolding at TEL-898A
23 May 2025MediumPX_PP-436A-CSSPSM25/Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
25 Dec 20251201000036065Corrective
06 Oct 20251201000029963Corrective