GLAND,CABLE,TYPE QR671,PTFE
Material 4200001459 · GLAND · Plant 1000
BReorderNormalSlow-moving
- Material
- 4200001459
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 7 FuncLocs A/B)
- Supplier
- PRIMA LOGAM SENTOSA PT
- Lead time
- 40 d · P80 52 d
- Unit price
- Rp 561,410
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~40 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 1 now.
- 5.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 561,410 · order by 01 Oct 2026
Expected arrival ≈ 40 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 561,410
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 280 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 52.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~16 days.
Installed on 7 functional locations
2 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-436A-CSS CONTROL SWITCH STATION FOR PP-436A-M | B | 1 | 1 | 0.19 |
| PX_PP-1612-M MOTOR FOR PP-1612 | B | 1 | 0 | 0.19 |
| PX_FIT-1526D BFW FLOW | C | 1 | 0 | 0.04 |
| PX_LIT-1793-45A HE-1277C LEVEL | C | 1 | 0 | 0.03 |
| PX_LIT-1984 VD-884A LEVEL | C | 1 | 0 | 0.03 |
| PX_PIT-817 FUEL OIL PRESSURE | C | 3 | 0 | 0.04 |
| PX_TEL-898A TEMPERATURE | S | 1 | 1 | 0.01 |
Lead time and procurement
Lead time 40 ± 16 days (PO history + category, 2 PO lines) · on-time 44%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 Jul 2025 | PR03 Regular replenishment | 1 | Rp 548,497 | 28 Aug 2025 | 29 d |
| 18 May 2025 | PR01 Import / long-lead | 2 | Rp 574,322 | 09 Aug 2025 | 83 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Jun 2025 | Medium | PX_TEL-898A | Install scaffolding at TEL-898A |
| 23 May 2025 | Medium | PX_PP-436A-CSS | PSM25/Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Dec 2025 | 1 | 201000036065 | Corrective |
| 06 Oct 2025 | 1 | 201000029963 | Corrective |