GLAND,CABLE,SIZE CR730,INCOLOY
Material 4200001499 · GLAND · Plant 1000
AReorderCriticalStockout
- Material
- 4200001499
- Category
- GLAND
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (6 of 12 FuncLocs A/B)
- Supplier
- RAJAWALI INDUSTRI ABADI PT
- Lead time
- 42 d · P80 59 d
- Unit price
- Rp 270,461
Recommendation
- 1.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~42 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
- 5.Installed on 12 FuncLoc(s), 6 of them criticality A/B.
- 6.ML early warning: 69% probability of demand in the next 90 days.
Proposed purchase requisition
6 EA
Rp 1.6M · order by 01 Oct 2026
Expected arrival ≈ 42 days
ML early warningConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 9%
Unit price
Rp 270,461
PO history
ML early warning: 69% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 356 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 294.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 12 functional locations
6 with criticality A/B · 14 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-697A-M MOTOR FOR PP-697A | A | 1 | 1 | 0.62 |
| PX_JBX-1662B JUNCTION BOX (EXP) | A | 1 | 0 | 0.01 |
| PX_KC-464A-M MOTOR FOR KC-464A | A | 1 | 0 | 0.57 |
| PX_PIT-1253 QUENCH OIL PRESSURE | A | 1 | 0 | 0.04 |
| PX_TIT-1967 TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_TEL-781A CRACKED GAS OUTLET BF-112 | B | 1 | 0 | 0.01 |
| PX_JBX-1224 JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_TEL-1157-25A TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_TEL-1271A-41B TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_TEL-1287A PP-1819A BTM | C | 1 | 0 | 0.01 |
| PX_TIT-1625B-48A PP-1478B TEMPERATURE | C | 1 | 0 | 0.04 |
| PX_PIT-111B PP-570 PRESSURE | S | 3 | 0 | 0.04 |
Lead time and procurement
Lead time 42 ± 12 days (PO history, 3 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 30 May 2026 | PR06 Regular replenishment | 2 | Rp 270,461 | 01 Aug 2026 | 63 d |
| 21 May 2026 | PR10 Other | 1 | Rp 264,046 | 09 Jul 2026 | 49 d |
| 30 Mar 2026 | PR06 Regular replenishment | 1 | Rp 277,427 | 21 May 2026 | 52 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Jul 2025 | Medium | PX_PP-697A-M | PP-697A-M high temp |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Oct 2025 | 1 | 201000031578 | Corrective |
| 10 Aug 2025 | 2 | 201000031538 | Corrective |
| 10 Aug 2025 | 1 | 201000031538 | Corrective |
| 12 Jun 2025 | 1 | 201000030569 | Corrective |