Sparely
DU

GLAND,CABLE,MODEL AK496,NBR

Material 4200001501 · GLAND · Plant 1000

AReduceSlow-moving
Material
4200001501
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 52 d
Unit price
Rp 183,915 (est.)

Recommendation

  • 1.Forecast 1.9 EA/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.Stock 64 exceeds the level to keep (6) by 58.
  • 5.Installed on 8 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
64 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 230 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 329.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 8 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1593
PRESSURE
A100.04
PX_PP-1740B-M
MOTOR FOR PP-1740B
A100.19
PX_PP-1007C-CSS
CONTROL SWITCH STATION FOR PP-1007C-M
B121.05
PX_PP-1384B-CSS
CONTROL SWITCH STATION FOR PP-1384B-M
B110.62
PX_JBX-1771
JUNCTION BOX
C100.01
PX_KC-266B-M
MOTOR FOR KC-266B
C200.57
PX_TEL-423A-17B
CRACKED GAS OUTLET BF-109
C100.01
PX_LIT-105
LEVEL
S100.03

Lead time and procurement

Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Oct 2025MediumPX_PP-1007C-CSS[MSI-B-25-XSL-380] Permanent repair
22 Jun 2025LowPX_PP-1007C-CSSReplace lamp as per PM finding
12 Jun 2025MediumPX_PP-1384B-CSSReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
13 Feb 20262201000023423Corrective