Sparely
DU

GLAND,CABLE,MODEL GF985,A182F11

Material 4200001543 · GLAND · Plant 1000

AReorderNormalBelow reorder point
Material
4200001543
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 11 FuncLocs A/B)
Supplier
PRIMA LOGAM SENTOSA PT
Lead time
26 d · P80 52 d
Unit price
Rp 53,388

Recommendation

  • 1.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~26 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 11 FuncLoc(s), 8 of them criticality A/B.
  • 6.ML early warning: 39% probability of demand in the next 90 days.
Proposed purchase requisition
3 EA
Rp 160,164 · order by 01 Oct 2026
Expected arrival ≈ 26 days
ML early warningLast turnaround used 1Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 1%
Unit price
Rp 53,388
PO history
ML early warning: 39% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 145 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 570.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 11 functional locations

8 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_LIT-485
LEVEL
A141.75
PX_PP-392A-M
MOTOR FOR PP-392A
A131.05
PX_PP-1758A-M
MOTOR FOR PP-1758A
A100.19
PX_TIT-992A
TEMPERATURE
A100.04
PX_JBX-486A
JUNCTION BOX
B110.01
PX_KC-853D-M
MOTOR FOR KC-853D
B111.00
PX_PP-743D-M
MOTOR FOR PP-743D
B100.19
PX_TEL-1920-44B
TEMPERATURE
B100.01
PX_PP-1498C-M
MOTOR FOR PP-1498C
C100.19
PX_TEL-349-6A
CRACKED GAS OUTLET BF-109
C100.01
PY_PP-1800A-CSS
CONTROL SWITCH STATION FOR PP-1800A-M
C100.19

Lead time and procurement

Lead time 26 ± 16 days (PO history + category, 2 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
15 Aug 2026PR03
Regular replenishment
2Rp 53,21906 Sept 202622 d
12 Dec 2025PR06
Regular replenishment
1Rp 53,55705 Jan 202624 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Aug 2026EmergencyPX_PP-392A-MPP-392A-M high temp
12 Aug 2026MediumPY_LIT-485Replace lamp as per PM finding
03 Jul 2026LowPX_PP-392A-M[MSI-B-26-GEW-387/M] Replace line
05 May 2026MediumPY_LIT-485AR25/tranmsitter low performance
29 Nov 2025HighPY_LIT-485AR25/tranmsitter low performance
13 Aug 2025MediumPY_LIT-485Leak from packing
28 Jun 2025MediumPX_KC-853D-MKC-853D-M bearing noise
12 May 2025MediumPX_JBX-486AReplace lamp as per PM finding
04 May 2025MediumPX_PP-392A-MPSM25/Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
09 May 20261201000002247Corrective
05 Nov 20251203000016457Turnaround