GLAND,CABLE,MODEL GF985,A182F11
Material 4200001543 · GLAND · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4200001543
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 11 FuncLocs A/B)
- Supplier
- PRIMA LOGAM SENTOSA PT
- Lead time
- 26 d · P80 52 d
- Unit price
- Rp 53,388
Recommendation
- 1.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~26 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 11 FuncLoc(s), 8 of them criticality A/B.
- 6.ML early warning: 39% probability of demand in the next 90 days.
Proposed purchase requisition
3 EA
Rp 160,164 · order by 01 Oct 2026
Expected arrival ≈ 26 days
ML early warningLast turnaround used 1Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 1%
Unit price
Rp 53,388
PO history
ML early warning: 39% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 145 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 570.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 11 functional locations
8 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_LIT-485 LEVEL | A | 1 | 4 | 1.75 |
| PX_PP-392A-M MOTOR FOR PP-392A | A | 1 | 3 | 1.05 |
| PX_PP-1758A-M MOTOR FOR PP-1758A | A | 1 | 0 | 0.19 |
| PX_TIT-992A TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_JBX-486A JUNCTION BOX | B | 1 | 1 | 0.01 |
| PX_KC-853D-M MOTOR FOR KC-853D | B | 1 | 1 | 1.00 |
| PX_PP-743D-M MOTOR FOR PP-743D | B | 1 | 0 | 0.19 |
| PX_TEL-1920-44B TEMPERATURE | B | 1 | 0 | 0.01 |
| PX_PP-1498C-M MOTOR FOR PP-1498C | C | 1 | 0 | 0.19 |
| PX_TEL-349-6A CRACKED GAS OUTLET BF-109 | C | 1 | 0 | 0.01 |
| PY_PP-1800A-CSS CONTROL SWITCH STATION FOR PP-1800A-M | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 26 ± 16 days (PO history + category, 2 PO lines) · on-time 44%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Aug 2026 | PR03 Regular replenishment | 2 | Rp 53,219 | 06 Sept 2026 | 22 d |
| 12 Dec 2025 | PR06 Regular replenishment | 1 | Rp 53,557 | 05 Jan 2026 | 24 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Aug 2026 | Emergency | PX_PP-392A-M | PP-392A-M high temp |
| 12 Aug 2026 | Medium | PY_LIT-485 | Replace lamp as per PM finding |
| 03 Jul 2026 | Low | PX_PP-392A-M | [MSI-B-26-GEW-387/M] Replace line |
| 05 May 2026 | Medium | PY_LIT-485 | AR25/tranmsitter low performance |
| 29 Nov 2025 | High | PY_LIT-485 | AR25/tranmsitter low performance |
| 13 Aug 2025 | Medium | PY_LIT-485 | Leak from packing |
| 28 Jun 2025 | Medium | PX_KC-853D-M | KC-853D-M bearing noise |
| 12 May 2025 | Medium | PX_JBX-486A | Replace lamp as per PM finding |
| 04 May 2025 | Medium | PX_PP-392A-M | PSM25/Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 May 2026 | 1 | 201000002247 | Corrective |
| 05 Nov 2025 | 1 | 203000016457 | Turnaround |