GLAND,CABLE,TYPE AN581,A182F11
Material 4200001548 · GLAND · Plant 1000
AReduceNon-moving
- Material
- 4200001548
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 52 d
- Unit price
- Rp 183,915 (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 5 exceeds the level to keep (2) by 3.
- 5.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
4 / 9
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 12.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 8 functional locations
2 with criticality A/B · 10 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1101A-M MOTOR FOR PP-1101A | A | 2 | 0 | 0.19 |
| PX_TEL-784 HE-1034A OUTLET | B | 1 | 0 | 0.01 |
| PX_JBX-222 JUNCTION BOX (EXP) | C | 1 | 0 | 0.01 |
| PX_JBX-473C JUNCTION BOX (EXP) | C | 1 | 0 | 0.01 |
| PX_JBX-938A JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_PP-246C-CSS CONTROL SWITCH STATION FOR PP-246C-M | C | 1 | 0 | 0.19 |
| PX_TIT-941B-47A TEMPERATURE | C | 1 | 0 | 0.04 |
| PX_TEL-1031C VD-993B OUTLET | S | 2 | 1 | 0.44 |
Lead time and procurement
Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Jul 2025 | Medium | PX_TEL-1031C | Repair insulation TEL-1031C |
Recent goods issues
Never issued in the 17-month history.