GLAND,CABLE,TYPE SH979,GRAPHITE
Material 4200001572 · GLAND · Plant 1000
AReduceSlow-moving
- Material
- 4200001572
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 52 d
- Unit price
- Rp 183,915 (est.)
Recommendation
- 1.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.Stock 47 exceeds the level to keep (6) by 41.
- 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
47 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 279 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 202.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 5 functional locations
4 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TEL-1726 CRACKED GAS OUTLET BF-101 | A | 1 | 0 | 0.01 |
| PX_TIT-1882B CL-1578 TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_PP-1366A-M MOTOR FOR PP-1366A | B | 3 | 0 | 0.19 |
| PX_PP-390B-CSS CONTROL SWITCH STATION FOR PP-390B-M | B | 1 | 0 | 0.19 |
| PX_PP-473B-M MOTOR FOR PP-473B | S | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Dec 2025 | 2 | 201000022762 | Corrective |
| 20 Aug 2025 | 3 | 201000014278 | Corrective |