GLAND,CABLE,MODEL UN365,CS
Material 4200001614 · GLAND · Plant 1000
AReduceNon-moving
- Material
- 4200001614
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 52 d
- Unit price
- Rp 183,915 (est.)
Recommendation
- 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 64 exceeds the level to keep (2) by 62.
- 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
64 / 0
no open PO
Today Min / Max
10 / 31
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.5%
stockout risk now 0%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 24.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 6 functional locations
2 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-178A-M MOTOR FOR KC-178A | A | 1 | 1 | 0.57 |
| PX_TIT-499C-42A TEMPERATURE | B | 1 | 0 | 0.04 |
| PX_JBX-1200A JUNCTION BOX (EXP) | C | 1 | 0 | 0.01 |
| PX_JBX-828A JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_TEL-806B TEMPERATURE | S | 1 | 2 | 0.87 |
| PX_PP-1323-M MOTOR FOR PP-1323 | S | 4 | 0 | 0.19 |
Lead time and procurement
Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Mar 2026 | Emergency | PX_TEL-806B | Leak from packing |
| 06 Jul 2025 | Medium | PX_TEL-806B | Inspection TEL-806B.ok |
| 09 May 2025 | Medium | PX_KC-178A-M | Install scaffolding at KC-178A-M |
Recent goods issues
Never issued in the 17-month history.