Material 4200001614 · GLAND · Plant 1000

AReduceNon-moving
Material
4200001614
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 52 d
Unit price
Rp 183,915 (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 64 exceeds the level to keep (2) by 62.
  • 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
64 / 0
no open PO
Today Min / Max
10 / 31
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.5%
stockout risk now 0%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 24.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 6 functional locations

2 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-178A-M
MOTOR FOR KC-178A
A110.57
PX_TIT-499C-42A
TEMPERATURE
B100.04
PX_JBX-1200A
JUNCTION BOX (EXP)
C100.01
PX_JBX-828A
JUNCTION BOX
C100.01
PX_TEL-806B
TEMPERATURE
S120.87
PX_PP-1323-M
MOTOR FOR PP-1323
S400.19

Lead time and procurement

Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Mar 2026EmergencyPX_TEL-806BLeak from packing
06 Jul 2025MediumPX_TEL-806BInspection TEL-806B.ok
09 May 2025MediumPX_KC-178A-MInstall scaffolding at KC-178A-M

Recent goods issues

Never issued in the 17-month history.