GLAND,CABLE,MODEL RP697,VITON
Material 4200001632 · GLAND · Plant 1000
AReorderCriticalStockout
- Material
- 4200001632
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 52 d
- Unit price
- Rp 183,915 (est.)
Recommendation
- 1.Forecast 2.6 EA/year: 2.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
- 5.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 1.1M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
100.0%
stockout risk now 18%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 5 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 912.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 5 functional locations
1 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-1657 PRESSURE | A | 1 | 0 | 0.04 |
| PX_TEL-1093 PP-1808A BTM | C | 1 | 1 | 0.01 |
| PX_JBX-212 JUNCTION BOX (EXP) | C | 1 | 0 | 0.01 |
| PX_TEL-1360D-46A CRACKED GAS OUTLET BF-105 | C | 1 | 0 | 0.01 |
| PX_TEL-1942-2 TEMPERATURE | C | 2 | 0 | 0.01 |
Lead time and procurement
Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 May 2025 | Medium | PX_TEL-1093 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Sept 2026 | 1 | 201000025207 | Corrective |
| 22 Jul 2026 | 1 | 201000005856 | Corrective |
| 12 Jan 2026 | 1 | 201000032767 | Corrective |
| 13 Nov 2025 | 1 | 201000037913 | Corrective |