GLAND,CABLE,TYPE LM902,NBR

Material 4200001644 · GLAND · Plant 1000

BReduceExcess
Material
4200001644
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
B (3 of 5 FuncLocs A/B)
Supplier
KARYA REFRAKTORI ABADI PT
Lead time
26 d · P80 52 d
Unit price
Rp 481,417

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~26 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 4 exceeds the level to keep (2) by 2.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 481,417
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 42 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 52.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~16 days.

Installed on 5 functional locations

3 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-983
FLOW
B100.04
PX_JBX-1535A
JUNCTION BOX
B100.01
PY_PP-1800A-M
MOTOR FOR PP-1800A
B100.19
PX_PIT-1369-21B
VD-727 PRESSURE
C100.04
PX_PP-497-CSS
CONTROL SWITCH STATION FOR PP-497-M
C100.19

Lead time and procurement

Lead time 26 ± 16 days (PO history + category, 1 PO lines) · on-time 56%

PR dateTypeQtyUnit priceDeliveryLead time
07 May 2026PR03
Regular replenishment
1Rp 481,41724 May 202617 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
20 Aug 20261205000024375Other maintenance