GLAND,CABLE,SIZE EJ969,SS304

Material 4200001659 · GLAND · Plant 1000

AReorderNormalSlow-moving
Material
4200001659
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
PERMATA LOGAM ABADI PT
Lead time
21 d · P80 22 d
Unit price
Rp 152,634

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~21 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 152,634 · order by 01 Oct 2026
Expected arrival ≈ 21 days
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 152,634
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 366 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 196.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-438B-CSS
CONTROL SWITCH STATION FOR PP-438B-M
A131.05
PX_FIT-738
FLOW
B100.04
PX_TEL-1200-59B
PP-1735 OUTLET
C100.01
PX_FIT-1446A
FLOW
S100.04

Lead time and procurement

Lead time 21 ± 9 days (PO history, 5 PO lines) · on-time 57%

PR dateTypeQtyUnit priceDeliveryLead time
06 Jun 2026PR06
Regular replenishment
1Rp 152,63418 Jun 202612 d
03 Mar 2026PR03
Regular replenishment
1Rp 146,69425 Mar 202622 d
20 Feb 2026PR03
Regular replenishment
2Rp 157,34514 Mar 202622 d
24 Oct 2025PR03
Regular replenishment
1Rp 146,26309 Nov 202516 d
26 Sept 2025PR06
Regular replenishment
1Rp 159,18408 Oct 202512 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_PP-438B-CSSLeak from packing
09 Oct 2025MediumPX_PP-438B-CSSPP-438B-CSS lamp indicator broken
05 May 2025MediumPX_PP-438B-CSSPP-438B-CSS lamp indicator broken

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20251201000006329Corrective
17 May 20251201000021628Corrective