GLAND,CABLE,SIZE SM784,MONEL
Material 4200001674 · GLAND · Plant 1000
AReorderCriticalStockout
- Material
- 4200001674
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- PRIMA LOGAM SENTOSA PT
- Lead time
- 33 d · P80 52 d
- Unit price
- Rp 221,169
Recommendation
- 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~33 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 663,507 · order by 01 Oct 2026
Expected arrival ≈ 33 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 8%
Unit price
Rp 221,169
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 92 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 337.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 3 functional locations
1 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-463-CSS CONTROL SWITCH STATION FOR PP-463-M | A | 1 | 0 | 0.19 |
| PX_KC-717-M MOTOR FOR KC-717 | C | 3 | 2 | 1.00 |
| PX_TEL-1957B CRACKED GAS OUTLET BF-103 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 33 ± 16 days (PO history + category, 1 PO lines) · on-time 44%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 06 Aug 2026 | PR03 Regular replenishment | 2 | Rp 221,169 | 23 Sept 2026 | 48 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Oct 2025 | Medium | PX_KC-717-M | Replace lamp as per PM finding |
| 21 May 2025 | Medium | PX_KC-717-M | KC-717-M bearing noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Jul 2026 | 1 | 202000006106 | Emergency |
| 24 Jun 2025 | 1 | 201000014526 | Corrective |