GLAND,CABLE,SIZE SM784,MONEL

Material 4200001674 · GLAND · Plant 1000

AReorderCriticalStockout
Material
4200001674
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
PRIMA LOGAM SENTOSA PT
Lead time
33 d · P80 52 d
Unit price
Rp 221,169

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~33 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 663,507 · order by 01 Oct 2026
Expected arrival ≈ 33 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 8%
Unit price
Rp 221,169
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 92 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 337.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 3 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-463-CSS
CONTROL SWITCH STATION FOR PP-463-M
A100.19
PX_KC-717-M
MOTOR FOR KC-717
C321.00
PX_TEL-1957B
CRACKED GAS OUTLET BF-103
C100.01

Lead time and procurement

Lead time 33 ± 16 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
06 Aug 2026PR03
Regular replenishment
2Rp 221,16923 Sept 202648 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Oct 2025MediumPX_KC-717-MReplace lamp as per PM finding
21 May 2025MediumPX_KC-717-MKC-717-M bearing noise

Recent goods issues

Posting dateQtyOrderOrder type
01 Jul 20261202000006106Emergency
24 Jun 20251201000014526Corrective