GLAND,CABLE,SIZE LK857,INCOLOY

Material 4200001752 · GLAND · Plant 1000

CReducePotentially obsolete
Material
4200001752
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 52 d
Unit price
Rp 183,915 (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 10 exceeds the level to keep (2) by 8.
Price estimatedLead time estimated
On hand / on order
10 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 49,834/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~16 days.

Installed on 4 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TEL-1945-5B
TEMPERATURE
C110.01
PX_FIT-1618-11B
FLOW
C100.04
PX_LIT-1808C
VD-1778 LEVEL
C100.03
PX_DPT-145
HE-224C DP
S100.06

Lead time and procurement

Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 May 2025LowPX_TEL-1945-5BRepair insulation TEL-1945-5B

Recent goods issues

Never issued in the 17-month history.