GLAND,CABLE,SIZE EG906,GRAPHITE
Material 4200002134 · GLAND · Plant 1000
CMonitorSlow-moving
- Material
- 4200002134
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- LANGIT SEJAHTERA GLOBAL PT
- Lead time
- 23 d · P80 52 d
- Unit price
- Rp 93,186
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 93,186
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 376 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~16 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-744B-M MOTOR FOR PP-744B | C | 1 | 2 | 0.19 |
Lead time and procurement
Lead time 23 ± 16 days (PO history + category, 1 PO lines) · on-time 71%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Jul 2026 | PR06 Regular replenishment | 2 | Rp 93,186 | 25 Jul 2026 | 8 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Aug 2026 | Low | PX_PP-744B-M | Painting PP-744B-M |
| 11 May 2025 | Medium | PX_PP-744B-M | PP-744B-M bearing noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Sept 2025 | 1 | 201000025080 | Corrective |
| 19 Sept 2025 | 1 | 201000025080 | Corrective |