Material 4200002668 · GLAND · Plant 1000

AReorderCriticalStockout
Material
4200002668
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
KARYA REFRAKTORI ABADI PT
Lead time
27 d · P80 52 d
Unit price
Rp 65,199

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~27 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 130,398 · order by 01 Oct 2026
Expected arrival ≈ 27 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 2%
Unit price
Rp 65,199
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 230 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 106.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-136B-M
MOTOR FOR PP-136B
A110.19
PX_TEL-1539A-32A
HE-526A OUTLET
C100.01
PX_TIT-1354
TEMPERATURE
C100.04
PX_TIT-1959
HE-785C TEMPERATURE
C100.04

Lead time and procurement

Lead time 27 ± 16 days (PO history + category, 1 PO lines) · on-time 56%

PR dateTypeQtyUnit priceDeliveryLead time
05 Jun 2025PR06
Regular replenishment
2Rp 65,19929 Jun 202524 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 May 2025MediumPX_PP-136B-MPP-136B-M bearing noise

Recent goods issues

Posting dateQtyOrderOrder type
13 Feb 20261201000035004Corrective