GLAND,CABLE,TYPE IC459,A182F11
Material 4200002668 · GLAND · Plant 1000
AReorderCriticalStockout
- Material
- 4200002668
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 4 FuncLocs A/B)
- Supplier
- KARYA REFRAKTORI ABADI PT
- Lead time
- 27 d · P80 52 d
- Unit price
- Rp 65,199
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~27 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 130,398 · order by 01 Oct 2026
Expected arrival ≈ 27 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 2%
Unit price
Rp 65,199
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 230 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 106.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-136B-M MOTOR FOR PP-136B | A | 1 | 1 | 0.19 |
| PX_TEL-1539A-32A HE-526A OUTLET | C | 1 | 0 | 0.01 |
| PX_TIT-1354 TEMPERATURE | C | 1 | 0 | 0.04 |
| PX_TIT-1959 HE-785C TEMPERATURE | C | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 27 ± 16 days (PO history + category, 1 PO lines) · on-time 56%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Jun 2025 | PR06 Regular replenishment | 2 | Rp 65,199 | 29 Jun 2025 | 24 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 May 2025 | Medium | PX_PP-136B-M | PP-136B-M bearing noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Feb 2026 | 1 | 201000035004 | Corrective |