TERMINAL BLOCK,SIZE GS350,INCOLOY
Material 4200002917 · TERMINAL BLOCK · Plant 1000
- Material
- 4200002917
- Category
- TERMINAL BLOCK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 12 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 26 d · P80 34 d
- Unit price
- Rp 67,918 (est.)
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~26 days; expected demand during lead time 0.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 12 FuncLoc(s), 2 of them criticality A/B.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 246.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~18 days.
Installed on 12 functional locations
2 with criticality A/B · 18 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_JBX-1889 JUNCTION BOX (EXP) | A | 1 | 0 | 0.01 |
| PX_JBX-321 JUNCTION BOX | A | 1 | 0 | 0.01 |
| PX_JBX-1209 JUNCTION BOX (EXP) | C | 1 | 0 | 0.01 |
| PX_JBX-1310A JUNCTION BOX (EXP) | C | 1 | 0 | 0.01 |
| PX_JBX-163C JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_JBX-1881 JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_JBX-567B JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_JBX-850D JUNCTION BOX | C | 4 | 0 | 0.01 |
| PY_1579-7660-F28 SPARE SLOT | C | 1 | 0 | 0.01 |
| PY_4038-3317-F13 FUEL OIL LINE | C | 2 | 0 | 0.01 |
| PY_JBX-1637A JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_JBX-1290D JUNCTION BOX | S | 3 | 0 | 0.01 |
Lead time and procurement
Lead time 26 ± 10 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Jan 2026 | 2 | 204000016196 | Preventive |
| 04 Jan 2026 | 1 | 201000000911 | Corrective |