TERMINAL BLOCK,MODEL WC326,A182F11
Material 4200002929 · TERMINAL BLOCK · Plant 1000
- Material
- 4200002929
- Category
- TERMINAL BLOCK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 26 d · P80 34 d
- Unit price
- Rp 67,918 (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~26 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 2 exceeds the level to keep (1) by 1.
- 5.Installed on 8 FuncLoc(s), 1 of them criticality A/B.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 328,108/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~18 days.
Installed on 8 functional locations
1 with criticality A/B · 12 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_8143-6957-F11-A FIELD DEVICE | B | 2 | 0 | 0.01 |
| PX_JBX-1192B JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_JBX-473C JUNCTION BOX (EXP) | C | 1 | 0 | 0.01 |
| PX_JBX-938A JUNCTION BOX | C | 1 | 0 | 0.01 |
| PY_1579-7660-F28 SPARE SLOT | C | 1 | 0 | 0.01 |
| PY_2144-5557A-F17 MARSHALLING TERMINAL | C | 1 | 0 | 0.01 |
| PY_JBX-1637A JUNCTION BOX | C | 4 | 0 | 0.01 |
| PX_JBX-1290D JUNCTION BOX | S | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 26 ± 10 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.