TERMINAL BLOCK,SIZE KF407,CS
Material 4200002939 · TERMINAL BLOCK · Plant 1000
BReduceSlow-moving
- Material
- 4200002939
- Category
- TERMINAL BLOCK
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 4 FuncLocs A/B)
- Supplier
- MITRA PERKASA PRATAMA PT
- Lead time
- 24 d · P80 34 d
- Unit price
- Rp 67,918
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~24 days; expected demand during lead time 0.0.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 13 exceeds the level to keep (1) by 12.
- 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Last turnaround used 1Single source
On hand / on order
13 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 67,918
PO history
ML early warning: 26% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~18 days.
Installed on 4 functional locations
1 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_JBX-977B JUNCTION BOX | B | 1 | 0 | 0.01 |
| PX_JBX-1285 JUNCTION BOX | C | 3 | 1 | 0.01 |
| PX_JBX-1784A JUNCTION BOX | C | 1 | 1 | 0.44 |
| PX_JBX-960 JUNCTION BOX | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 24 ± 10 days (PO history + category, 1 PO lines) · on-time 46%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Aug 2026 | PR03 Regular replenishment | 2 | Rp 67,918 | 06 Sept 2026 | 16 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Aug 2025 | Medium | PX_JBX-1784A | Leak from packing |
| 23 May 2025 | High | PX_JBX-1285 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Nov 2025 | 1 | 203000030725 | Turnaround |