Sparely
DU

TERMINAL BLOCK,SIZE KF407,CS

Material 4200002939 · TERMINAL BLOCK · Plant 1000

BReduceSlow-moving
Material
4200002939
Category
TERMINAL BLOCK
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 4 FuncLocs A/B)
Supplier
MITRA PERKASA PRATAMA PT
Lead time
24 d · P80 34 d
Unit price
Rp 67,918

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~24 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 13 exceeds the level to keep (1) by 12.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Last turnaround used 1Single source
On hand / on order
13 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 67,918
PO history
ML early warning: 26% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~18 days.

Installed on 4 functional locations

1 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-977B
JUNCTION BOX
B100.01
PX_JBX-1285
JUNCTION BOX
C310.01
PX_JBX-1784A
JUNCTION BOX
C110.44
PX_JBX-960
JUNCTION BOX
C100.01

Lead time and procurement

Lead time 24 ± 10 days (PO history + category, 1 PO lines) · on-time 46%

PR dateTypeQtyUnit priceDeliveryLead time
21 Aug 2026PR03
Regular replenishment
2Rp 67,91806 Sept 202616 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Aug 2025MediumPX_JBX-1784ALeak from packing
23 May 2025HighPX_JBX-1285Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
14 Nov 20251203000030725Turnaround