TERMINAL BLOCK,MODEL XY753,GRAPHITE
Material 4200002971 · TERMINAL BLOCK · Plant 1000
CReducePotentially obsolete
- Material
- 4200002971
- Category
- TERMINAL BLOCK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 26 d · P80 34 d
- Unit price
- Rp 67,918 (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~26 days; expected demand during lead time 0.0.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 6 exceeds the level to keep (1) by 5.
Price estimatedLead time estimated
On hand / on order
6 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 67,918
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 331,889/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~18 days.
Installed on 6 functional locations
0 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_JBX-1817B JUNCTION BOX | C | 1 | 2 | 0.44 |
| PX_JBX-1784A JUNCTION BOX | C | 1 | 1 | 0.44 |
| PX_JBX-896A JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_JBX-947A JUNCTION BOX | C | 1 | 0 | 0.01 |
| PY_1892-4524-F34-A FIELD DEVICE | C | 1 | 0 | 0.01 |
| PY_6598-2536A-F21-A EMPTY | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 26 ± 10 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Mar 2026 | Medium | PX_JBX-1817B | Replace gland JBX-1817B |
| 07 Aug 2025 | Medium | PX_JBX-1784A | Leak from packing |
| 16 May 2025 | Low | PX_JBX-1817B | Painting JBX-1817B |
Recent goods issues
Never issued in the 17-month history.