TERMINAL BLOCK,SIZE AK895,NBR
Material 4200003035 · TERMINAL BLOCK · Plant 1000
CReducePotentially obsolete
- Material
- 4200003035
- Category
- TERMINAL BLOCK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- RAJAWALI INDUSTRI ABADI PT
- Lead time
- 43 d · P80 34 d
- Unit price
- Rp 24,987
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~43 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 25 exceeds the level to keep (1) by 24.
Single source
On hand / on order
25 / 0
no open PO
Today Min / Max
10 / 18
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 24,987
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7,660/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~18 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_JBX-550 JUNCTION BOX | C | 1 | 0 | 0.01 |
| PY_9621-5181-F29 FIELD DEVICE | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 43 ± 10 days (PO history + category, 1 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 Oct 2025 | PR04 Regular (other) | 1 | Rp 24,987 | 29 Jan 2026 | 94 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.