Sparely
DU

TERMINAL BLOCK,SIZE AH125,SS304

Material 4200003342 · TERMINAL BLOCK · Plant 1000

CReducePotentially obsolete
Material
4200003342
Category
TERMINAL BLOCK
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
26 d · P80 34 d
Unit price
Rp 67,918 (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~26 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 12 exceeds the level to keep (0) by 12.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
5 / 15
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 67,918
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3,102/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~18 days.

Installed on 1 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-1779
JUNCTION BOX
C400.01

Lead time and procurement

Lead time 26 ± 10 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.