Sparely
DU

TERMINAL BLOCK,MODEL SJ486,SS304

Material 4200003604 · TERMINAL BLOCK · Plant 1000

CReduceSlow-moving
Material
4200003604
Category
TERMINAL BLOCK
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
PRIMA LOGAM SENTOSA PT
Lead time
26 d · P80 30 d
Unit price
Rp 30,515

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~26 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 4 exceeds the level to keep (2) by 2.
Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 30,515
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 379 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~18 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-192
JUNCTION BOX (EXP)
C100.01

Lead time and procurement

Lead time 26 ± 9 days (PO history, 3 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
30 May 2026PR06
Regular replenishment
1Rp 31,05403 Jul 202634 d
11 Dec 2025PR03
Regular replenishment
1Rp 30,46029 Dec 202518 d
15 Nov 2025PR03
Regular replenishment
2Rp 30,51509 Dec 202524 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
17 Sept 20251204000030900Preventive