TERMINAL BLOCK,MODEL LH590,CS
Material 4200003908 · TERMINAL BLOCK · Plant 1000
CMonitorSlow-moving
- Material
- 4200003908
- Category
- TERMINAL BLOCK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- SAMUDRA INSTRUMEN JAYA PT
- Lead time
- 26 d · P80 30 d
- Unit price
- Rp 112,994
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~26 days; expected demand during lead time 0.0.
- 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
Single sourceOpen PO
On hand / on order
2 / 1
next delivery 09 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
99.0%
stockout risk now 0%
Unit price
Rp 112,994
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 358 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~18 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_4330-5940A-F21-B FEED LINE | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 26 ± 7 days (PO history, 4 PO lines) · on-time 37%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 Sept 2026 | PR03 Regular replenishment | 1 | Rp 110,895 | 09 Oct 2026 open | 28 d |
| 06 Oct 2025 | PR03 Regular replenishment | 1 | Rp 118,963 | 08 Nov 2025 | 33 d |
| 26 Aug 2025 | PR06 Regular replenishment | 1 | Rp 110,676 | 18 Sept 2025 | 23 d |
| 20 Aug 2025 | PR03 Regular replenishment | 1 | Rp 115,093 | 12 Sept 2025 | 23 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Oct 2025 | 1 | 201000038855 | Corrective |
| 08 Oct 2025 | 2 | 201000038855 | Corrective |