TERMINAL BLOCK,TYPE LO541,VITON
Material 4200004430 · TERMINAL BLOCK · Plant 1000
CReduceSlow-moving
- Material
- 4200004430
- Category
- TERMINAL BLOCK
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- MEGA TEKNIK JAYA PT
- Lead time
- 31 d · P80 44 d
- Unit price
- Rp 160,990
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~31 days; expected demand during lead time 0.0.
- 3.A 98.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 4 exceeds the level to keep (1) by 3.
Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.2%
stockout risk now 0%
Unit price
Rp 160,990
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 241 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~18 days.
Installed on 1 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_4920-7545B-F22-B EMPTY | C | 2 | 0 | 0.01 |
Lead time and procurement
Lead time 31 ± 13 days (PO history, 3 PO lines) · on-time 25%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 May 2026 | PR03 Regular replenishment | 1 | Rp 170,521 | 23 Jun 2026 | 51 d |
| 03 Jan 2026 | PR06 Regular replenishment | 2 | Rp 157,139 | 05 Feb 2026 | 33 d |
| 05 Oct 2025 | PR03 Regular replenishment | 2 | Rp 160,990 | 27 Oct 2025 | 22 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Feb 2026 | 1 | 201000027591 | Corrective |