LAMP,LED,18W,220VAC,E27
Material 4200004671 · LAMP · Plant 1000
AMonitorHealthy
- Material
- 4200004671
- Category
- LAMP
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (8 of 20 FuncLocs A/B)
- Supplier
- KARYA INSTRUMEN SENTOSA PT
- Lead time
- 48 d · P80 58 d
- Unit price
- Rp 403,312
Recommendation
- 1.Forecast 127 EA/year: 127 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~48 days; expected demand during lead time 17.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 119.
- 4.Installed on 20 FuncLoc(s), 8 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 22Single sourceAbnormal consumptionOpen PO
On hand / on order
27 / 549
next delivery 03 Oct 2026
Today Min / Max
19 / 57
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 34
Rec. Max
119
order qty 69
Service level
99.9%
stockout risk now 0%
Unit price
Rp 403,312
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 31 issue days in the last 180 days, last issue 8 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 22 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (32 units) excluded from the baseline.
Demand pattern Smooth · 140 issue days · 8 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 34.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.
Installed on 20 functional locations
8 with criticality A/B · 24 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1892B-CSS CONTROL SWITCH STATION FOR PP-1892B-M | A | 1 | 1 | 0.19 |
| PX_PP-1070B-CSS CONTROL SWITCH STATION FOR PP-1070B-M | A | 1 | 0 | 0.19 |
| PX_PP-1905A-CSS CONTROL SWITCH STATION FOR PP-1905A-M | A | 1 | 0 | 0.19 |
| PY_PP-1682-CSS CONTROL SWITCH STATION FOR PP-1682-M | A | 4 | 0 | 0.19 |
| PY_PP-899A-CSS CONTROL SWITCH STATION FOR PP-899A-M | B | 1 | 2 | 0.62 |
| PX_PP-1678A-CSS CONTROL SWITCH STATION FOR PP-1678A-M | B | 1 | 0 | 0.19 |
| PX_PP-1837A-CSS CONTROL SWITCH STATION FOR PP-1837A-M | B | 1 | 0 | 0.19 |
| PY_PP-1862B-CSS CONTROL SWITCH STATION FOR PP-1862B-M | B | 1 | 0 | 0.19 |
| PX_PP-1012C-CSS CONTROL SWITCH STATION FOR PP-1012C-M | C | 1 | 0 | 0.19 |
| PX_PP-1139-CSS CONTROL SWITCH STATION FOR PP-1139-M | C | 1 | 0 | 0.19 |
| PX_PP-217-CSS CONTROL SWITCH STATION FOR PP-217-M | C | 1 | 0 | 0.19 |
| PX_PP-246C-CSS CONTROL SWITCH STATION FOR PP-246C-M | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 48 ± 26 days (PO history, 55 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Sept 2026 | PR03 Regular replenishment | 122 | Rp 412,124 | 27 Oct 2026 open | 35 d |
| 20 Sept 2026 | PR03 Regular replenishment | 58 | Rp 406,418 | 27 Oct 2026 open | 37 d |
| 11 Sept 2026 | PR06 Regular replenishment | 122 | Rp 411,725 | 03 Oct 2026 open | 22 d |
| 02 Sept 2026 | PR03 Regular replenishment | 77 | Rp 424,795 | 07 Oct 2026 open | 35 d |
| 01 Sept 2026 | PR03 Regular replenishment | 115 | Rp 406,501 | 21 Nov 2026 open | 81 d |
| 30 Aug 2026 | PR03 Regular replenishment | 51 | Rp 399,024 | 15 Sept 2026 | 16 d |
| 27 Aug 2026 | PR03 Regular replenishment | 55 | Rp 391,470 | 08 Oct 2026 open | 42 d |
| 15 Aug 2026 | PR03 Regular replenishment | 52 | Rp 398,775 | 29 Sept 2026 | 45 d |
| 22 Jul 2026 | PR03 Regular replenishment | 123 | Rp 390,776 | 24 Aug 2026 | 33 d |
| 20 Jul 2026 | PR06 Regular replenishment | 51 | Rp 394,884 | 21 Aug 2026 | 32 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 17 Apr 2026 | High | PY_PP-899A-CSS | PP-899A-CSS lamp indicator broken |
| 19 May 2025 | Low | PY_PP-899A-CSS | [MSI-B-25-KAJ-316/M] Replace line |
| 14 May 2025 | Medium | PX_PP-1892B-CSS | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Sept 2026 | 1 | 209000029477 | Other maintenance |
| 22 Sept 2026 | 1 | 201000039118 | Corrective |
| 14 Sept 2026 | 1 | 201000018595 | Corrective |
| 05 Sept 2026 | 1 | 201000030840 | Corrective |
| 19 Aug 2026 | 2 | 205000024375 | Other maintenance |
| 01 Aug 2026 | 1 | 201000008499 | Corrective |
| 31 Jul 2026 | 2 | 201000001731 | Corrective |
| 30 Jul 2026 | 1 | 201000000379 | Corrective |
| 26 Jul 2026 | 1 | 201000025485 | Corrective |
| 25 Jul 2026 | 2 | 203000004330 | Turnaround |
| 08 Jul 2026 | 1 | 204000027608 | Preventive |
| 07 Jul 2026 | 1 | 201000039886 | Corrective |
| 05 Jul 2026 | 1 | 201000027956 | Corrective |
| 21 Jun 2026 | 1 | 204000024639 | Preventive |
| 19 Jun 2026 | 1 | 201000007604 | Corrective |