LAMP,LED,12W,220VAC,FLOOD
Material 4200004809 · LAMP · Plant 1000
AReorderNormalSlow-moving
- Material
- 4200004809
- Category
- LAMP
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 41 d · P80 60 d
- Unit price
- Rp 403,312 (est.)
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~41 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
- 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 403,312 · order by 01 Oct 2026
Expected arrival ≈ 41 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 403,312
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 247 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 195.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~19 days.
Installed on 5 functional locations
3 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1366A-CSS CONTROL SWITCH STATION FOR PP-1366A-M | A | 1 | 0 | 0.19 |
| PX_PP-1657A-CSS CONTROL SWITCH STATION FOR PP-1657A-M | B | 2 | 0 | 0.19 |
| PX_PP-601-CSS CONTROL SWITCH STATION FOR PP-601-M | B | 1 | 0 | 0.19 |
| PX_PP-1448B-CSS CONTROL SWITCH STATION FOR PP-1448B-M | C | 1 | 1 | 0.19 |
| PX_PP-217-CSS CONTROL SWITCH STATION FOR PP-217-M | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 41 ± 24 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 May 2025 | Medium | PX_PP-1448B-CSS | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Jan 2026 | 1 | 201000017477 | Corrective |