LAMP,LED,36W,24VDC,E27
Material 4200005196 · LAMP · Plant 1000
BReorderNormalSlow-moving
- Material
- 4200005196
- Category
- LAMP
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- SURYA LOGAM LESTARI PT
- Lead time
- 38 d · P80 50 d
- Unit price
- Rp 169,856
Recommendation
- 1.Forecast 1.2 EA/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~38 days; expected demand during lead time 0.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 679,424 · order by 01 Oct 2026
Expected arrival ≈ 38 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 4%
Unit price
Rp 169,856
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 466 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 40.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~19 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PP-315A-CSS CONTROL SWITCH STATION FOR PP-315A-M | B | 1 | 3 | 1.05 |
Lead time and procurement
Lead time 38 ± 27 days (PO history, 3 PO lines) · on-time 20%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 Jun 2026 | PR05 Project / turnaround | 2 | Rp 169,856 | 12 Aug 2026 | 70 d |
| 26 Dec 2025 | PR03 Regular replenishment | 1 | Rp 172,649 | 10 Jan 2026 | 15 d |
| 27 Nov 2025 | PR03 Regular replenishment | 2 | Rp 167,980 | 17 Dec 2025 | 20 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Mar 2026 | Medium | PY_PP-315A-CSS | Install cover plate for MCP cracking |
| 10 Jan 2026 | High | PY_PP-315A-CSS | Painting PP-315A-CSS |
| 20 Jun 2025 | High | PY_PP-315A-CSS | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Jun 2025 | 3 | 201000000529 | Corrective |