LAMP,LED,18W,24VDC,T8

Material 4200006341 · LAMP · Plant 1000

BReduceSlow-moving
Material
4200006341
Category
LAMP
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
DUTA ENERGI INTERNASIONAL PT
Lead time
39 d · P80 60 d
Unit price
Rp 376,306

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~39 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 5 exceeds the level to keep (2) by 3.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single sourceSame description as 1 other material number
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 376,306
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (2 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 793,050/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~19 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-715A-CSS
CONTROL SWITCH STATION FOR PP-715A-M
B110.19

Lead time and procurement

Lead time 39 ± 24 days (PO history + category, 2 PO lines) · on-time 50%

PR dateTypeQtyUnit priceDeliveryLead time
02 Aug 2026PR03
Regular replenishment
1Rp 379,07816 Sept 202645 d
15 Sept 2025PR05
Project / turnaround
1Rp 373,53413 Oct 202528 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 May 2025MediumPX_PP-715A-CSSLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
24 May 20251203000004890Turnaround
19 May 20251203000004890Turnaround