FAN,COOLING MOTOR,MODEL JM498,VITON

Material 4200006376 · FAN · Plant 1000

AReorderCriticalStockout
Material
4200006376
Category
FAN
Base unit
EA
MRP type
Non Stock
Criticality
A (16 of 22 FuncLocs A/B)
Supplier
DUTA ENERGI INTERNASIONAL PT
Lead time
57 d · P80 57 d
Unit price
Rp 1.2M

Recommendation

  • 1.Forecast 5.2 EA/year: 5.2 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~57 days; expected demand during lead time 0.8.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 11.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 11 now.
  • 5.Installed on 22 FuncLoc(s), 16 of them criticality A/B.
  • 6.ML early warning: 44% probability of demand in the next 90 days.
Proposed purchase requisition
11 EA
Rp 13.2M · order by 01 Oct 2026
Expected arrival ≈ 57 days
ML early warningConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
11
order qty 6
Service level
99.9%
stockout risk now 51%
Unit price
Rp 1.2M
PO history
ML early warning: 44% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 127 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 7 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 22 functional locations

16 with criticality A/B · 28 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_KC-419A-M
MOTOR FOR KC-419A
A141.43
PX_PP-1964B-M
MOTOR FOR PP-1964B
A131.05
PX_PP-1121-M
MOTOR FOR PP-1121
A121.05
PX_PP-891C-M
MOTOR FOR PP-891C
A120.62
PX_KC-317B-M
MOTOR FOR KC-317B
A100.57
PX_KC-365C-M
MOTOR FOR KC-365C
A400.57
PX_PP-1309A-M
MOTOR FOR PP-1309A
A100.19
PX_PP-1939-M
MOTOR FOR PP-1939
A200.19
PX_PP-412-M
MOTOR FOR PP-412
A100.19
PX_PP-508D-M
MOTOR FOR PP-508D
A300.19
PX_PP-612-M
MOTOR FOR PP-612
A100.19
PX_PP-810A-M
MOTOR FOR PP-810A
A100.19

Lead time and procurement

Lead time 57 ± 17 days (PO history, 4 PO lines) · on-time 50%

PR dateTypeQtyUnit priceDeliveryLead time
22 Jan 2026PR01
Import / long-lead
2Rp 1.2M19 Mar 202656 d
31 Dec 2025PR03
Regular replenishment
3Rp 1.2M28 Feb 202659 d
20 Nov 2025PR06
Regular replenishment
2Rp 1.2M06 Jan 202647 d
13 Oct 2025PR06
Regular replenishment
3Rp 1.2M26 Nov 202544 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Jun 2026EmergencyPY_KC-419A-M[MSI-B-26-HBR-389] Permanent repair
04 Feb 2026MediumPX_PP-891C-MRepair insulation PP-891C-M
20 Jan 2026MediumPX_PP-479-MPainting PP-479-M
26 Nov 2025MediumPX_PP-1337-MMegger test PP-1337-M
22 Nov 2025HighPX_PP-1121-MReplace lamp as per PM finding
21 Nov 2025MediumPX_PP-479-MReplace lamp as per PM finding
11 Nov 2025MediumPY_KC-419A-MInstall scaffolding at KC-419A-M
28 Oct 2025EmergencyPX_PP-1964B-MReplace lamp as per PM finding
22 Sept 2025LowPX_PP-1964B-MPP-1964B-M bearing noise
16 Aug 2025LowPX_PP-1964B-MInstall scaffolding at PP-1964B-M

Recent goods issues

Posting dateQtyOrderOrder type
27 May 20261201000002230Corrective
26 May 20261201000002230Corrective
28 Feb 20262201000035660Corrective
05 Feb 20261201000018578Corrective
22 Jan 20261201000014384Corrective
24 Nov 20251201000020636Corrective
23 May 20251201000031996Corrective