FAN,COOLING MOTOR,SIZE PN611,SS316
Material 4200006408 · FAN · Plant 1000
AReduceExcess
- Material
- 4200006408
- Category
- FAN
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 9 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 65 d · P80 103 d
- Unit price
- Rp 1.3M (est.)
Recommendation
- 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~65 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Stock 85 exceeds the level to keep (3) by 82.
- 5.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
Last turnaround used 2Price estimatedLead time estimated
On hand / on order
85 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.3M
Category + unit estimate
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 94 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 573.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 9 functional locations
6 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1945B-M MOTOR FOR PP-1945B | A | 1 | 1 | 0.19 |
| PX_PP-1013A-M MOTOR FOR PP-1013A | A | 1 | 0 | 0.19 |
| PX_PP-1101A-M MOTOR FOR PP-1101A | A | 1 | 0 | 0.19 |
| PX_PP-123-M MOTOR FOR PP-123 | A | 1 | 0 | 0.19 |
| PX_PP-1718-M MOTOR FOR PP-1718 | B | 1 | 1 | 0.62 |
| PX_PP-120B-M MOTOR FOR PP-120B | B | 1 | 0 | 0.19 |
| PX_PP-1747B-M MOTOR FOR PP-1747B | C | 1 | 0 | 0.19 |
| PX_PP-1938A-M MOTOR FOR PP-1938A | C | 1 | 0 | 0.19 |
| UT_PP-641A-M MOTOR FOR PP-641A | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 65 ± 31 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Aug 2025 | Low | PX_PP-1718-M | PP-1718-M bearing noise |
| 24 May 2025 | Medium | PX_PP-1945B-M | Repair insulation PP-1945B-M |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Jun 2026 | 1 | 201000032450 | Corrective |
| 29 Dec 2025 | 1 | 203000036002 | Turnaround |
| 28 Dec 2025 | 1 | 203000036002 | Turnaround |