Sparely
DU

FAN,COOLING MOTOR,SIZE UQ726,A182F11

Material 4200006507 · FAN · Plant 1000

ALong-leadReduceNon-moving
Material
4200006507
Category
FAN
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
PRIMA LOGAM SENTOSA PT
Lead time
80 d · P80 103 d
Unit price
Rp 1.3M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~80 days; expected demand during lead time 0.0.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 6 exceeds the level to keep (2) by 4.
  • 5.Long lead time: 80% of deliveries took up to 103 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 7.ML early warning: 50% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceOpen PO
On hand / on order
6 / 2
next delivery 05 Jan 2027
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 1.3M
PO history
ML early warning: 50% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1141D-M
MOTOR FOR PP-1141D
A100.19
PX_PP-1747B-M
MOTOR FOR PP-1747B
C100.19

Lead time and procurement

Lead time 80 ± 31 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
04 Sept 2026PR03
Regular replenishment
2Rp 1.3M05 Jan 2027
open
123 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.