FAN,COOLING MOTOR,TYPE MT764,NBR
Material 4200006508 · FAN · Plant 1000
BLong-leadMonitorSlow-moving
- Material
- 4200006508
- Category
- FAN
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 3 FuncLocs A/B)
- Supplier
- TIRTA SUPLINDO NUSANTARA PT
- Lead time
- 74 d · P80 103 d
- Unit price
- Rp 628,910
Recommendation
- 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~74 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.Long lead time: 80% of deliveries took up to 103 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
4 / 1
next delivery 01 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 628,910
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 360 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 77.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~27 days.
Installed on 3 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-339C-M MOTOR FOR PP-339C | B | 2 | 0 | 0.19 |
| PX_PP-1213-M MOTOR FOR PP-1213 | C | 1 | 0 | 0.19 |
| PX_PP-224-M MOTOR FOR PP-224 | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 74 ± 31 days (PO history + category, 2 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Aug 2026 | PR05 Project / turnaround | 1 | Rp 638,673 | 01 Dec 2026 open | 104 d |
| 10 Jul 2026 | PR03 Regular replenishment | 2 | Rp 619,147 | 21 Sept 2026 | 73 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Oct 2025 | 3 | 201000022498 | Corrective |
| 05 Oct 2025 | 1 | 201000022498 | Corrective |