FAN,COOLING MOTOR,TYPE OI508,VITON

Material 4200006682 · FAN · Plant 1000

BLong-leadReorderCriticalStockout
Material
4200006682
Category
FAN
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
DUTA ENERGI INTERNASIONAL PT
Lead time
53 d · P80 103 d
Unit price
Rp 1.5M

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~53 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 103 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 6.0M · order by 01 Oct 2026
Expected arrival ≈ 53 days
Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 14%
Unit price
Rp 1.5M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 258 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 148.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~27 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-402A-M
MOTOR FOR PP-402A
B100.19

Lead time and procurement

Lead time 53 ± 31 days (PO history + category, 2 PO lines) · on-time 50%

PR dateTypeQtyUnit priceDeliveryLead time
13 Nov 2025PR06
Regular replenishment
2Rp 1.5M27 Dec 202544 d
20 Sept 2025PR06
Regular replenishment
2Rp 1.5M17 Oct 202527 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
16 Jan 20261201000037819Corrective
08 Dec 20251201000034802Corrective
07 Dec 20251201000034802Corrective