FAN,COOLING MOTOR,SIZE ZZ702,GRAPHITE

Material 4200006800 · FAN · Plant 1000

BLong-leadReorderNormalBelow reorder point
Material
4200006800
Category
FAN
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
TIRTA SUPLINDO NUSANTARA PT
Lead time
90 d · P80 165 d
Unit price
Rp 1.3M

Recommendation

  • 1.Forecast 3.0 EA/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~90 days; expected demand during lead time 0.7.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 9.
  • 4.On hand 1 + on order 1 is at or below the reorder point: order 7 now.
  • 5.Long lead time: 80% of deliveries took up to 165 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 8.8M · order by 01 Oct 2026
Expected arrival ≈ 90 days
Long-leadSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 31 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
9
order qty 4
Service level
99.8%
stockout risk now 9%
Unit price
Rp 1.3M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 87 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 296.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~27 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-828B-M
MOTOR FOR PP-828B
B100.19

Lead time and procurement

Lead time 90 ± 50 days (PO history, 5 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
03 May 2026PR01
Import / long-lead
1Rp 1.3M31 Oct 2026
open
181 d
18 Feb 2026PR03
Regular replenishment
1Rp 1.2M29 Jul 2026161 d
11 Sept 2025PR03
Regular replenishment
3Rp 1.3M24 Oct 202543 d
25 Jul 2025PR05
Project / turnaround
1Rp 1.3M28 Sept 202565 d
31 May 2025PR03
Regular replenishment
2Rp 1.2M13 Aug 202574 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
06 Jul 20261201000037176Corrective
12 Jun 20261201000013103Corrective
19 Nov 20251201000038448Corrective
07 Jul 20253201000018841Corrective