FAN,COOLING MOTOR,SIZE ZZ702,GRAPHITE
Material 4200006800 · FAN · Plant 1000
BLong-leadReorderNormalBelow reorder point
- Material
- 4200006800
- Category
- FAN
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- TIRTA SUPLINDO NUSANTARA PT
- Lead time
- 90 d · P80 165 d
- Unit price
- Rp 1.3M
Recommendation
- 1.Forecast 3.0 EA/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~90 days; expected demand during lead time 0.7.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 9.
- 4.On hand 1 + on order 1 is at or below the reorder point: order 7 now.
- 5.Long lead time: 80% of deliveries took up to 165 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 8.8M · order by 01 Oct 2026
Expected arrival ≈ 90 days
Long-leadSingle sourceOpen PO
On hand / on order
1 / 1
next delivery 31 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
9
order qty 4
Service level
99.8%
stockout risk now 9%
Unit price
Rp 1.3M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 87 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 296.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~27 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-828B-M MOTOR FOR PP-828B | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 90 ± 50 days (PO history, 5 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 May 2026 | PR01 Import / long-lead | 1 | Rp 1.3M | 31 Oct 2026 open | 181 d |
| 18 Feb 2026 | PR03 Regular replenishment | 1 | Rp 1.2M | 29 Jul 2026 | 161 d |
| 11 Sept 2025 | PR03 Regular replenishment | 3 | Rp 1.3M | 24 Oct 2025 | 43 d |
| 25 Jul 2025 | PR05 Project / turnaround | 1 | Rp 1.3M | 28 Sept 2025 | 65 d |
| 31 May 2025 | PR03 Regular replenishment | 2 | Rp 1.2M | 13 Aug 2025 | 74 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Jul 2026 | 1 | 201000037176 | Corrective |
| 12 Jun 2026 | 1 | 201000013103 | Corrective |
| 19 Nov 2025 | 1 | 201000038448 | Corrective |
| 07 Jul 2025 | 3 | 201000018841 | Corrective |