Sparely
DU

FAN,COOLING MOTOR,TYPE LI523,CS

Material 4200006953 · FAN · Plant 1000

CMonitorSlow-moving
Material
4200006953
Category
FAN
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
RAJAWALI INDUSTRI ABADI PT
Lead time
53 d · P80 103 d
Unit price
Rp 1.3M

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~53 days; expected demand during lead time 0.1.
  • 3.A 95.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
95.1%
stockout risk now 0%
Unit price
Rp 1.3M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 279 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~27 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-226-M
MOTOR FOR KC-226
C100.57

Lead time and procurement

Lead time 53 ± 31 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
17 Jun 2026PR06
Regular replenishment
2Rp 1.3M06 Jul 202619 d
28 May 2026PR06
Regular replenishment
2Rp 1.2M16 Jul 202649 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
26 Dec 20251201000001435Corrective