FAN,COOLING MOTOR,MODEL FH56,INCOLOY
Material 4200007390 · FAN · Plant 1000
ALong-leadReduceExcess
- Material
- 4200007390
- Category
- FAN
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- BINTANG SUPLINDO GLOBAL PT
- Lead time
- 68 d · P80 103 d
- Unit price
- Rp 814,002
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~68 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.Stock 6 exceeds the level to keep (3) by 3.
- 5.Long lead time: 80% of deliveries took up to 103 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
6 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 814,002
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 92 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 324.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1733A-M MOTOR FOR PP-1733A | A | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 68 ± 31 days (PO history + category, 1 PO lines) · on-time 29%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 19 Oct 2025 | PR06 Regular replenishment | 2 | Rp 814,002 | 05 Jan 2026 | 78 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Jul 2026 | Medium | PX_PP-1733A-M | Megger test PP-1733A-M |
| 22 May 2025 | Low | PX_PP-1733A-M | PP-1733A-M bearing noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Jul 2026 | 1 | 201000017983 | Corrective |