Sparely
DU

FAN,COOLING MOTOR,MODEL IV858,INCOLOY

Material 4200007851 · FAN · Plant 1000

BLong-leadReorderNormalSlow-moving
Material
4200007851
Category
FAN
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
TIRTA SUPLINDO NUSANTARA PT
Lead time
56 d · P80 103 d
Unit price
Rp 1.9M

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~56 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Long lead time: 80% of deliveries took up to 103 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 56 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.9M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 237 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 39.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~27 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1892B-M
MOTOR FOR PP-1892B
B110.19

Lead time and procurement

Lead time 56 ± 31 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
26 Mar 2026PR03
Regular replenishment
2Rp 2.0M03 Jun 202669 d
04 Jan 2026PR03
Regular replenishment
1Rp 1.9M18 Jan 202614 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 May 2025MediumPX_PP-1892B-MReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
06 Feb 20261201000038712Corrective