Sparely
DU

CABLE,INSTRUMENT,1PR X 0.75MM2,ARMOURED

Material 4200008195 · CABLE · Plant 1000

BLong-leadMonitorCritical insurance spare
Material
4200008195
Category
CABLE
Base unit
M
MRP type
Stock Item
Criticality
B (2 of 9 FuncLocs A/B)
Supplier
RAJAWALI INDUSTRI ABADI PT
Lead time
67 d · P80 140 d
Unit price
Rp 27,891

Recommendation

  • 1.Forecast 1.0 M/year: 1.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~67 days; expected demand during lead time 0.2.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 50.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Long lead time: 80% of deliveries took up to 140 days and the fastest seen in its category 21 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 9 FuncLoc(s), 2 of them criticality A/B.
  • 7.ML early warning: 35% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceSame description as 2 other material numbers
On hand / on order
13 / 0
no open PO
Today Min / Max
5 / 15
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
50
order qty 50
Service level
99.6%
stockout risk now 0%
Unit price
Rp 27,891
PO history
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 9 functional locations

2 with criticality A/B · 46.8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-486A
JUNCTION BOX
B510.01
PX_JBX-1811
JUNCTION BOX (EXP)
B2500.01
PX_JBX-1784A
JUNCTION BOX
C510.44
PX_JBX-1842A
JUNCTION BOX
C0.500.01
PX_JBX-324
JUNCTION BOX
C500.01
PX_JBX-666B
JUNCTION BOX
C0.500.01
PX_JBX-828A
JUNCTION BOX
C0.3200.01
PY_1129-1016A-F26-B
SPENT CAUSTIC LINE
C500.01
PY_JBX-955C
JUNCTION BOX
S0.500.01

Lead time and procurement

Lead time 67 ± 55 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
05 Jun 2026PR04
Regular (other)
2Rp 27,89107 Aug 202663 d
11 Sept 2025PR06
Regular replenishment
2Rp 28,39314 Oct 202533 d
15 May 2025PR03
Regular replenishment
2Rp 27,19622 Nov 2025191 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Aug 2025MediumPX_JBX-1784ALeak from packing
12 May 2025MediumPX_JBX-486AReplace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.