CABLE,INSTRUMENT,1PR X 1.5MM2,ARMOURED

Material 4200008213 · CABLE · Plant 1000

BReduceExcess
Material
4200008213
Category
CABLE
Base unit
M
MRP type
Stock Item
Criticality
B (2 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
39 d · P80 63 d
Unit price
Rp 55,622 (est.)

Recommendation

  • 1.Forecast 57 M/year: 57 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~39 days; expected demand during lead time 6.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 130, order up to 260.
  • 4.Stock 340 exceeds the level to keep (260) by 80.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimatedSame description as 2 other material numbers
On hand / on order
340 / 0
no open PO
Today Min / Max
80 / 140
static parameters in BoM
Rec. Min (reorder point)
130
safety stock 124
Rec. Max
260
order qty 130
Service level
99.9%
stockout risk now 0%
Unit price
Rp 55,622
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 64 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 49.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 4 functional locations

2 with criticality A/B · 23.5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-1713B
JUNCTION BOX (EXP)
B100.01
PY_7736-4147-F19-A
MARSHALLING TERMINAL
B1000.01
PX_JBX-116
JUNCTION BOX (EXP)
C1000.01
PY_JBX-1396
JUNCTION BOX
C2.500.01

Lead time and procurement

Lead time 39 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
29 Jul 202610201000004503Corrective
29 Jul 2026100201000004503Corrective
29 Jul 202620201000004503Corrective