CABLE,INSTRUMENT,4PR X 0.75MM2,ARMOURED
Material 4200008235 · CABLE · Plant 1000
CReorderNormalBelow reorder point
- Material
- 4200008235
- Category
- CABLE
- Base unit
- M
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- TIRTA SUPLINDO NUSANTARA PT
- Lead time
- 32 d · P80 41 d
- Unit price
- Rp 42,461
Recommendation
- 1.Forecast 148 M/year: 148 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~32 days; expected demand during lead time 13.
- 3.A 96.3% service level gives the lowest holding + downtime-risk cost: reorder at 44, order up to 193.
- 4.On hand 21 + on order 0 is at or below the reorder point: order 172 now.
Proposed purchase requisition
172 M
Rp 7.3M · order by 01 Oct 2026
Expected arrival ≈ 32 days
Single sourceAbnormal consumption
On hand / on order
21 / 0
no open PO
Today Min / Max
7 / 12
static parameters in BoM
Rec. Min (reorder point)
44
safety stock 31
Rec. Max
193
order qty 149
Service level
96.3%
stockout risk now 26%
Unit price
Rp 42,461
PO history
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 4 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 6 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 33.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~21 days.
Installed on 3 functional locations
0 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_JBX-222 JUNCTION BOX (EXP) | C | 2.5 | 0 | 0.01 |
| PY_3971-3955A-F20 FIELD DEVICE | C | 1 | 0 | 0.01 |
| PY_6868-7907B-F11-A SPARE SLOT | C | 2.5 | 0 | 0.01 |
Lead time and procurement
Lead time 32 ± 16 days (PO history, 6 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Jul 2026 | PR06 Regular replenishment | 47 | Rp 42,765 | 06 Aug 2026 | 21 d |
| 06 Feb 2026 | PR03 Regular replenishment | 99 | Rp 42,156 | 23 Feb 2026 | 17 d |
| 01 Jan 2026 | PR03 Regular replenishment | 127 | Rp 40,727 | 14 Feb 2026 | 44 d |
| 11 Aug 2025 | PR03 Regular replenishment | 55 | Rp 43,669 | 09 Sept 2025 | 29 d |
| 29 Jun 2025 | PR06 Regular replenishment | 101 | Rp 41,034 | 09 Aug 2025 | 41 d |
| 31 May 2025 | PR06 Regular replenishment | 147 | Rp 43,045 | 23 Jun 2025 | 23 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Sept 2026 | 50 | 204000019919 | Preventive |
| 20 Jul 2026 | 50 | 201000021863 | Corrective |
| 18 Dec 2025 | 50 | 201000025606 | Corrective |
| 18 Dec 2025 | 100 | 201000025606 | Corrective |
| 17 Nov 2025 | 10 | 201000029205 | Corrective |
| 12 Aug 2025 | 20 | 201000039661 | Corrective |
| 11 Aug 2025 | 20 | 201000039661 | Corrective |