Sparely
DU

CABLE,INSTRUMENT,8PR X 1.5MM2,ARMOURED

Material 4200008323 · CABLE · Plant 1000

ATransferNormalSlow-moving
Material
4200008323
Category
CABLE
Base unit
M
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
39 d · P80 63 d
Unit price
Rp 55,622 (est.)

Recommendation

  • 1.Forecast 11 M/year: 11 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~39 days; expected demand during lead time 1.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 100.
  • 4.On hand 25 + on order 0 is at or below the reorder point: 75 needed.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4200009142 holds spare stock: transfer 75 M instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
25 / 0
no open PO
Today Min / Max
16 / 26
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 49
Rec. Max
100
order qty 50
Service level
100.0%
stockout risk now 2%
Unit price
Rp 55,622
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 247 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 96.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
UT_JBX-691
JUNCTION BOX
A120.01

Lead time and procurement

Lead time 39 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Oct 2025MediumUT_JBX-691Install scaffolding at JBX-691
07 May 2025LowUT_JBX-691Install scaffolding at JBX-691

Recent goods issues

Posting dateQtyOrderOrder type
27 Jan 202650201000020819Corrective