CABLE,INSTRUMENT,8PR X 1.5MM2,ARMOURED
Material 4200008323 · CABLE · Plant 1000
ATransferNormalSlow-moving
- Material
- 4200008323
- Category
- CABLE
- Base unit
- M
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 39 d · P80 63 d
- Unit price
- Rp 55,622 (est.)
Recommendation
- 1.Forecast 11 M/year: 11 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~39 days; expected demand during lead time 1.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 100.
- 4.On hand 25 + on order 0 is at or below the reorder point: 75 needed.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
- 6.Identical part 4200009142 holds spare stock: transfer 75 M instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
25 / 0
no open PO
Today Min / Max
16 / 26
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 49
Rec. Max
100
order qty 50
Service level
100.0%
stockout risk now 2%
Unit price
Rp 55,622
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 247 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 96.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~21 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| UT_JBX-691 JUNCTION BOX | A | 1 | 2 | 0.01 |
Lead time and procurement
Lead time 39 ± 25 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Oct 2025 | Medium | UT_JBX-691 | Install scaffolding at JBX-691 |
| 07 May 2025 | Low | UT_JBX-691 | Install scaffolding at JBX-691 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Jan 2026 | 50 | 201000020819 | Corrective |