CABLE,INSTRUMENT,1PR X 1.5MM2,ARMOURED
Material 4200008403 · CABLE · Plant 1000
CReducePotentially obsolete
- Material
- 4200008403
- Category
- CABLE
- Base unit
- M
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI INDUSTRI ABADI PT
- Lead time
- 52 d · P80 63 d
- Unit price
- Rp 56,640
Recommendation
- 1.Forecast 0.0 M/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~52 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 3 exceeds the level to keep (0) by 3.
Convert to Non StockSingle sourceSame description as 2 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 56,640
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3,494/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~21 days.
Installed on 1 functional locations
0 with criticality A/B · 2.5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_JBX-118A JUNCTION BOX | C | 2.5 | 0 | 0.01 |
Lead time and procurement
Lead time 52 ± 25 days (PO history + category, 1 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Dec 2025 | PR01 Import / long-lead | 1 | Rp 56,640 | 29 Mar 2026 | 91 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
Never issued in the 17-month history.