CABLE,INSTRUMENT,1PR X 1.5MM2,ARMOURED

Material 4200008403 · CABLE · Plant 1000

CReducePotentially obsolete
Material
4200008403
Category
CABLE
Base unit
M
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
RAJAWALI INDUSTRI ABADI PT
Lead time
52 d · P80 63 d
Unit price
Rp 56,640

Recommendation

  • 1.Forecast 0.0 M/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~52 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 3 exceeds the level to keep (0) by 3.
Convert to Non StockSingle sourceSame description as 2 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 56,640
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3,494/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~21 days.

Installed on 1 functional locations

0 with criticality A/B · 2.5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-118A
JUNCTION BOX
C2.500.01

Lead time and procurement

Lead time 52 ± 25 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
28 Dec 2025PR01
Import / long-lead
1Rp 56,64029 Mar 202691 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.