DU

CABLE,INSTRUMENT,8PR X 1.5MM2,ARMOURED

Material 4200008405 · CABLE · Plant 1000

CMonitorSlow-moving
Material
4200008405
Category
CABLE
Base unit
M
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
39 d · P80 63 d
Unit price
Rp 55,622 (est.)

Recommendation

  • 1.Forecast 20 M/year: 20 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~39 days; expected demand during lead time 2.1.
  • 3.A 97.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 100.
Price estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
100
order qty 100
Service level
97.9%
stockout risk now 2%
Unit price
Rp 55,622
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 268 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~21 days.

Installed on 1 functional locations

0 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-805
JUNCTION BOX
C500.01

Lead time and procurement

Lead time 39 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
06 Jan 2026100201000031269Corrective