CABLE,INSTRUMENT,1PR X 1.5MM2,ARMOURED

Material 4200008860 · CABLE · Plant 1000

CMonitorSlow-moving
Material
4200008860
Category
CABLE
Base unit
M
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
PRIMA LOGAM SENTOSA PT
Lead time
39 d · P80 63 d
Unit price
Rp 55,622

Recommendation

  • 1.Forecast 12 M/year: 12 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~39 days; expected demand during lead time 1.2.
  • 3.A 97.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 50.
Single sourceSame description as 2 other material numbers
On hand / on order
10 / 0
no open PO
Today Min / Max
9 / 14
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
50
order qty 50
Service level
97.5%
stockout risk now 2%
Unit price
Rp 55,622
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 220 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~21 days.

Installed on 1 functional locations

0 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_8881-3127A-F17-A
FIELD DEVICE
C2500.01

Lead time and procurement

Lead time 39 ± 25 days (PO history + category, 1 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
11 Jul 2026PR04
Regular (other)
15Rp 55,62217 Aug 202637 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
23 Feb 202650201000029300Corrective