CABLE,INSTRUMENT,2PR X 0.75MM2,ARMOURED
Material 4200008924 · CABLE · Plant 1000
BMonitorCritical insurance spare
- Material
- 4200008924
- Category
- CABLE
- Base unit
- M
- MRP type
- Non Stock
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- LANGIT SEJAHTERA GLOBAL PT
- Lead time
- 45 d · P80 63 d
- Unit price
- Rp 64,087
Recommendation
- 1.Forecast 0.9 M/year: 0.9 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~45 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 50.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
50
order qty 50
Service level
99.8%
stockout risk now 0%
Unit price
Rp 64,087
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.
Installed on 1 functional locations
1 with criticality A/B · 0.32 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_JBX-1611 JUNCTION BOX | B | 0.32 | 1 | 0.44 |
Lead time and procurement
Lead time 45 ± 25 days (PO history + category, 1 PO lines) · on-time 71%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 Jun 2026 | PR03 Regular replenishment | 1 | Rp 64,087 | 05 Aug 2026 | 63 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Jun 2025 | Medium | PX_JBX-1611 | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.