CABLE,INSTRUMENT,2PR X 0.75MM2,ARMOURED

Material 4200008924 · CABLE · Plant 1000

BMonitorCritical insurance spare
Material
4200008924
Category
CABLE
Base unit
M
MRP type
Non Stock
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
LANGIT SEJAHTERA GLOBAL PT
Lead time
45 d · P80 63 d
Unit price
Rp 64,087

Recommendation

  • 1.Forecast 0.9 M/year: 0.9 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~45 days; expected demand during lead time 0.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 50.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
50
order qty 50
Service level
99.8%
stockout risk now 0%
Unit price
Rp 64,087
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~21 days.

Installed on 1 functional locations

1 with criticality A/B · 0.32 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-1611
JUNCTION BOX
B0.3210.44

Lead time and procurement

Lead time 45 ± 25 days (PO history + category, 1 PO lines) · on-time 71%

PR dateTypeQtyUnit priceDeliveryLead time
03 Jun 2026PR03
Regular replenishment
1Rp 64,08705 Aug 202663 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Jun 2025MediumPX_JBX-1611Replace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.