Sparely
DU

CABLE,INSTRUMENT,8PR X 1.5MM2,ARMOURED

Material 4200009142 · CABLE · Plant 1000

CReducePotentially obsolete
Material
4200009142
Category
CABLE
Base unit
M
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
39 d · P80 63 d
Unit price
Rp 55,622 (est.)

Recommendation

  • 1.Forecast 0.0 M/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~39 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 106 exceeds the level to keep (0) by 106.
Convert to Non StockPrice estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
106 / 0
no open PO
Today Min / Max
10 / 25
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 55,622
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3,494/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~21 days.

Installed on 1 functional locations

0 with criticality A/B · 0.32 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-1615A
JUNCTION BOX
C0.3200.01

Lead time and procurement

Lead time 39 ± 25 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.