Sparely
DU

FAN,COOLING MOTOR,DWG.121-7042,FOR PP-14

Material 4200010291 · FAN · Plant 1000

CReduceSlow-moving
Material
4200010291
Category
FAN
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
TIRTA SUPLINDO NUSANTARA PT
Lead time
62 d · P80 103 d
Unit price
Rp 2.7M

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~62 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 10 exceeds the level to keep (4) by 6; the level includes the 4 used in the last turnaround.
Last turnaround used 4Convert to Non StockSingle source
On hand / on order
10 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 2.7M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (4 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 95,484/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~27 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1498C-M
MOTOR FOR PP-1498C
C100.19

Lead time and procurement

Lead time 62 ± 31 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
16 Aug 2025PR06
Regular replenishment
1Rp 2.8M23 Oct 202568 d
29 Jun 2025PR03
Regular replenishment
1Rp 2.6M16 Aug 202548 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
04 Nov 20253203000016457Turnaround
03 Nov 20251203000016457Turnaround