FAN,COOLING MOTOR,DWG.796-6242,FOR PP-90

Material 4200010551 · FAN · Plant 1000

ALong-leadMonitorSlow-moving
Material
4200010551
Category
FAN
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
MEGA TEKNIK JAYA PT
Lead time
76 d · P80 103 d
Unit price
Rp 586,661

Recommendation

  • 1.Forecast 2.2 EA/year: 2.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~76 days; expected demand during lead time 0.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 9.
  • 4.Long lead time: 80% of deliveries took up to 103 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
9
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 586,661
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 219 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 430.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-902B-M
MOTOR FOR PP-902B
A100.19

Lead time and procurement

Lead time 76 ± 31 days (PO history + category, 1 PO lines) · on-time 25%

PR dateTypeQtyUnit priceDeliveryLead time
04 Jun 2026PR06
Regular replenishment
3Rp 586,66122 Sept 2026110 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
24 Feb 20263201000036183Corrective
23 Feb 20263201000036183Corrective