Sparely
DU

FAN,COOLING MOTOR,DWG.418-3544,FOR PP-12

Material 4200010951 · FAN · Plant 1000

BLong-leadMonitorSlow-moving
Material
4200010951
Category
FAN
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
GEMILANG INDUSTRI PERSADA PT
Lead time
99 d · P80 153 d
Unit price
Rp 2.7M

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~99 days; expected demand during lead time 0.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 153 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
1 / 2
next delivery 15 Dec 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 2.7M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 322 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 30.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~27 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-121B-M
MOTOR FOR PP-121B
B110.19

Lead time and procurement

Lead time 99 ± 50 days (PO history, 4 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
11 May 2026PR03
Regular replenishment
2Rp 2.7M15 Dec 2026
open
218 d
24 Feb 2026PR06
Regular replenishment
1Rp 2.7M05 Jun 2026101 d
05 Jan 2026PR03
Regular replenishment
1Rp 2.5M17 Mar 202671 d
15 Nov 2025PR03
Regular replenishment
1Rp 2.6M05 Mar 2026110 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 May 2025MediumPX_PP-121B-MReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
13 Nov 20251204000016756Preventive