FAN,COOLING MOTOR,DWG.222-1865,FOR PP-13
Material 4200010978 · FAN · Plant 1000
CMonitorSlow-moving
- Material
- 4200010978
- Category
- FAN
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- TIRTA SUPLINDO NUSANTARA PT
- Lead time
- 66 d · P80 103 d
- Unit price
- Rp 4.5M
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~66 days; expected demand during lead time 0.1.
- 3.A 95.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
Single source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
95.4%
stockout risk now 5%
Unit price
Rp 4.5M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 496 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~27 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1337-M MOTOR FOR PP-1337 | C | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 66 ± 31 days (PO history + category, 2 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 May 2025 | PR03 Regular replenishment | 1 | Rp 4.6M | 29 Jul 2025 | 79 d |
| 10 May 2025 | PR03 Regular replenishment | 1 | Rp 4.5M | 06 Jul 2025 | 57 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Nov 2025 | Medium | PX_PP-1337-M | Megger test PP-1337-M |
| 23 May 2025 | Low | PX_PP-1337-M | PSM25/Install cover plate for MCP cracki |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 May 2025 | 2 | 201000031996 | Corrective |