FAN,COOLING MOTOR,DWG.429-6924,FOR PP-21

Material 4200011116 · FAN · Plant 1000

SReorderHighStockout
Material
4200011116
Category
FAN
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
65 d · P80 103 d
Unit price
Rp 1.3M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~65 days; expected demand during lead time 0.1.
  • 3.A 90.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
Proposed purchase requisition
2 EA
Rp 2.5M · order by 01 Oct 2026
Expected arrival ≈ 65 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
90.6%
stockout risk now 9%
Unit price
Rp 1.3M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 352 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~27 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-210A-M
MOTOR FOR PP-210A
S120.62

Lead time and procurement

Lead time 65 ± 31 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Aug 2026LowPX_PP-210A-MMegger test PP-210A-M
11 May 2025LowPX_PP-210A-MLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
14 Oct 20252206000005902Other maintenance
13 Oct 20251206000005902Other maintenance